Data opsWeek of 2026-02-095/5 complete

Intake health

Secondary workspace for the standardized weekly feeds. Use it when planning needs a fresh batch or a feed breaks. Release stays primary. Use this workspace only when the data path needs attention.

3

Automated feeds

expected every week in the intake run

3

Input snapshots

planning cuts created from the intake batch

6

Parked files

tracked outside the standard weekly path

Planning path

The weekly operating path is complete.

>

Intake run

Maintain the standard weekly feed set

Intake should normally stay out of the operator path. Use this lane to rerun, inspect, or diagnose the batch when planning needs a fresh cut.

3

Expected feeds

the standard weekly set

3

Current batch

batch-44b010b3

3

Planning snapshots

cuts unlocked by intake

FeedWorkbookUpdatedCoverageStatus

Faraday Orders Q1.xlsm

Material Requests, Demand Pivot, Consumption, Batch Calculator

faraday_orders2026-02-09request_demand, request_item_profileready

Meridian Production Plan.xlsx

Production Plan, Material Order

meridian_plan2026-02-09style_demand, style_componentready

Production Schedule Week 47.xlsm

Text Database , Current WH YG WP, Requirements, Schedule, 335 Raw Material, Ops Material Orders

production_schedule2026-02-09lot_master, raw_material_map, inventory_snapshot, processing_requirementsready

Intake status

3

Feeds in batch

2026-02-09

4210

Raw rows

estimated rows across feeds

2

Canonical follow-up

master-data exceptions after intake

6

Maintenance lane

non-standard files tracked separately

Current batch

Batch batch-44b010b3

3 standardized feeds are frozen for 2026-02-09.

2026-02-09>

batch-44b010b3

4,210 estimated raw rows across parser families.

Unlocked by this intake

  • 3 scenario snapshots are available for planning input sync.
  • Master-data promotion can run against the same frozen workbook set.
  • Planning replays from the same intake batch instead of fresh spreadsheet cuts.

Maintenance lane

Non-standard files and follow-up work

Keep maintenance items visible without letting them dominate the weekly intake path.

6 files>

Beam Calendar 2026.xlsm

deferred

Phase-two woven-beam logic once the processing loop is stable. Demo placeholder metadata is shown because source workbooks are not stored in this repo.

Faraday Orders Legacy.xlsm

review

Older workbook variant retained only for comparison. Demo placeholder metadata is shown because source workbooks are not stored in this repo.

Ops Demand 02-09-26 New Form.xlsx

broken

Known broken workbook with thousands of #REF! issues and external links. Demo placeholder metadata is shown because source workbooks are not stored in this repo.

Ops Pull Sheet 02-09-2026.xls

deferred

Needs conversion to .xlsx before formula-level parity work. Demo placeholder metadata is shown because source workbooks are not stored in this repo.

Planning-Workflow-Reference.docx

deferred

Transcript source for workflow reconstruction. Demo placeholder metadata is shown because source workbooks are not stored in this repo.

Supplier-A Open Order Report.pdf

review

Supplier report reference with limited machine readability. Demo placeholder metadata is shown because source workbooks are not stored in this repo.

ForgeWorks Consultant

Ask me anything about your workflow.

Your ForgeWorks

0 modules

No modules yet. Chat to explore what fits your workflow.