Weekly load plan
Run the week, inspect the board, and clear risk. The week is published. Confirm the supplier follow-up and floor release details against the package.
published
Scenario
Week of 2026-02-09 published scenario
105,600
Scheduled lb
currently committed onto machines
18
Blocked slots
slots carrying material dependency risk
Planning path
The weekly operating path is complete.
>
Planning path
The weekly operating path is complete.
Load board
Machine/day load board
Committed load, capacity, and risk by machine and day.
23%
Board utilization
18
Material-blocked slots
18
Timing risks
2
Overloaded cells
M04
100% peak5 load days9,400 lb across 76.3 machine hours · next scheduled Feb 12
Avg util
21%
Material risks
1
Timing risks
2
Unique runs
2
Open days
10
>
M04
100% peak5 load days9,400 lb across 76.3 machine hours · next scheduled Feb 12
Avg util
21%
Material risks
1
Timing risks
2
Unique runs
2
Open days
10
Feb 12
Thu
106 / 25175
01-0306-001 from Faraday Orders Q1.xlsm
Run day 1/3
24.0 hrs · 2,957 lb
Due
Feb 14
WO
WO-25175-1
Material
KI20
Feb 13
Fri
106 / 25175
01-0306-001 from Faraday Orders Q1.xlsm
Run day 2/3
24.0 hrs · 2,957 lb
Due
Feb 14
WO
WO-25175-1
Material
KI20
Feb 14
Sat
106 / 25175
01-0306-001 from Faraday Orders Q1.xlsm
Run day 3/3
0.7 hrs · 86 lb
Due
Feb 14
WO
WO-25175-1
Material
KI20
Feb 15
Sun
No scheduled load.
Feb 16
Mon
No scheduled load.
Feb 17
Tue
No scheduled load.
Feb 18
Wed
No scheduled load.
Feb 19
Thu
106 / 25189
085337-039 from Meridian Production Plan.xlsx
Run day 1/2
24.0 hrs · 2,957 lb
Due
Feb 21
WO
WO-25189-13
Material
KI20
Feb 20
Fri
106 / 25189
085337-039 from Meridian Production Plan.xlsx
Run day 2/2
3.6 hrs · 443 lb
Due
Feb 21
WO
WO-25189-13
Material
KI20
Feb 21
Sat
No scheduled load.
Feb 22
Sun
No scheduled load.
Feb 23
Mon
No scheduled load.
Feb 24
Tue
No scheduled load.
Feb 25
Wed
No scheduled load.
Feb 26
Thu
No scheduled load.
M05
100% peak5 load days8,400 lb across 91.1 machine hours · next scheduled Feb 13
Avg util
25%
Material risks
1
Timing risks
2
Unique runs
2
Open days
10
>
M05
100% peak5 load days8,400 lb across 91.1 machine hours · next scheduled Feb 13
Avg util
25%
Material risks
1
Timing risks
2
Unique runs
2
Open days
10
Feb 12
Thu
No scheduled load.
Feb 13
Fri
228 SDH / 25339
01-0312-002 from Faraday Orders Q1.xlsm
Run day 1/3
24.0 hrs · 2,213 lb
Due
Feb 15
WO
WO-25339-2
Material
KI20
Feb 14
Sat
228 SDH / 25339
01-0312-002 from Faraday Orders Q1.xlsm
Run day 2/3
24.0 hrs · 2,213 lb
Due
Feb 15
WO
WO-25339-2
Material
KI20
Feb 15
Sun
228 SDH / 25339
01-0312-002 from Faraday Orders Q1.xlsm
Run day 3/3
0.8 hrs · 74 lb
Due
Feb 15
WO
WO-25339-2
Material
KI20
Feb 16
Mon
No scheduled load.
Feb 17
Tue
No scheduled load.
Feb 18
Wed
No scheduled load.
Feb 19
Thu
No scheduled load.
Feb 20
Fri
No scheduled load.
Feb 21
Sat
No scheduled load.
Feb 22
Sun
No scheduled load.
Feb 23
Mon
228 SDH / 25215
01-0306-001 from Production Schedule Week 47.xlsm
Run day 1/2
24.0 hrs · 2,213 lb
Due
Feb 25
WO
WO-25215-16
Material
KI20
Feb 24
Tue
228 SDH / 25215
01-0306-001 from Production Schedule Week 47.xlsm
Run day 2/2
18.3 hrs · 1,687 lb
Due
Feb 25
WO
WO-25215-16
Material
KI20
Feb 25
Wed
No scheduled load.
Feb 26
Thu
No scheduled load.
M07
100% peak4 load days8,100 lb across 70.5 machine hours · next scheduled Feb 15
Avg util
20%
Material risks
1
Timing risks
2
Unique runs
2
Open days
11
>
M07
100% peak4 load days8,100 lb across 70.5 machine hours · next scheduled Feb 15
Avg util
20%
Material risks
1
Timing risks
2
Unique runs
2
Open days
11
Feb 12
Thu
No scheduled load.
Feb 13
Fri
No scheduled load.
Feb 14
Sat
No scheduled load.
Feb 15
Sun
398 / 25246
01-1953-001 from Faraday Orders Q1.xlsm
Run day 1/2
24.0 hrs · 2,756 lb
Due
Feb 17
WO
WO-25246-3
Material
KI20
Feb 16
Mon
398 / 25246
01-1953-001 from Faraday Orders Q1.xlsm
Run day 2/2
17.8 hrs · 2,044 lb
Due
Feb 17
WO
WO-25246-3
Material
KI20
Feb 17
Tue
No scheduled load.
Feb 18
Wed
No scheduled load.
Feb 19
Thu
No scheduled load.
Feb 20
Fri
No scheduled load.
Feb 21
Sat
No scheduled load.
Feb 22
Sun
No scheduled load.
Feb 23
Mon
No scheduled load.
Feb 24
Tue
398 / 25279
082056-506 from Production Schedule Week 47.xlsm
Run day 1/2
24.0 hrs · 2,760 lb
Due
Feb 26
WO
WO-25279-17
Material
KI20
Feb 25
Wed
398 / 25279
082056-506 from Production Schedule Week 47.xlsm
Run day 2/2
4.7 hrs · 540 lb
Due
Feb 26
WO
WO-25279-17
Material
KI20
Feb 26
Thu
No scheduled load.
M08
100% peak4 load days11,800 lb across 79.9 machine hours · next scheduled Feb 14
Avg util
22%
Material risks
2
Timing risks
2
Unique runs
2
Open days
11
>
M08
100% peak4 load days11,800 lb across 79.9 machine hours · next scheduled Feb 14
Avg util
22%
Material risks
2
Timing risks
2
Unique runs
2
Open days
11
Feb 12
Thu
No scheduled load.
Feb 13
Fri
No scheduled load.
Feb 14
Sat
833 / 25444
082056-506 from Meridian Production Plan.xlsx
Run day 1/2
24.0 hrs · 2,738 lb
Due
Feb 16
WO
WO-25444-9
Material
4271
Feb 15
Sun
833 / 25444
082056-506 from Meridian Production Plan.xlsx
Run day 2/2
17.2 hrs · 1,962 lb
Due
Feb 16
WO
WO-25444-9
Material
4271
Feb 16
Mon
No scheduled load.
Feb 17
Tue
504 / 25134
082023-601 from Meridian Production Plan.xlsx
Run day 1/2
24.0 hrs · 4,403 lb
Due
Feb 19
WO
WO-25134-11
Material
KI34
Feb 18
Wed
504 / 25134
082023-601 from Meridian Production Plan.xlsx
Run day 2/2
14.7 hrs · 2,697 lb
Due
Feb 19
WO
WO-25134-11
Material
KI34
Feb 19
Thu
No scheduled load.
Feb 20
Fri
No scheduled load.
Feb 21
Sat
No scheduled load.
Feb 22
Sun
No scheduled load.
Feb 23
Mon
No scheduled load.
Feb 24
Tue
No scheduled load.
Feb 25
Wed
No scheduled load.
Feb 26
Thu
No scheduled load.
M11
100% peak2 load days5,000 lb across 37.5 machine hours · next scheduled Feb 15
Avg util
10%
Material risks
1
Timing risks
1
Unique runs
1
Open days
13
>
M11
100% peak2 load days5,000 lb across 37.5 machine hours · next scheduled Feb 15
Avg util
10%
Material risks
1
Timing risks
1
Unique runs
1
Open days
13
Feb 12
Thu
No scheduled load.
Feb 13
Fri
No scheduled load.
Feb 14
Sat
No scheduled load.
Feb 15
Sun
638 / 25459
082012-611 from Meridian Production Plan.xlsx
Run day 1/2
24.0 hrs · 3,200 lb
Due
Feb 17
WO
WO-25459-10
Material
KI20
Feb 16
Mon
638 / 25459
082012-611 from Meridian Production Plan.xlsx
Run day 2/2
13.5 hrs · 1,800 lb
Due
Feb 17
WO
WO-25459-10
Material
KI20
Feb 17
Tue
No scheduled load.
Feb 18
Wed
No scheduled load.
Feb 19
Thu
No scheduled load.
Feb 20
Fri
No scheduled load.
Feb 21
Sat
No scheduled load.
Feb 22
Sun
No scheduled load.
Feb 23
Mon
No scheduled load.
Feb 24
Tue
No scheduled load.
Feb 25
Wed
No scheduled load.
Feb 26
Thu
No scheduled load.
M17
100% peak6 load days21,800 lb across 107.7 machine hours · next scheduled Feb 16
Avg util
30%
Material risks
3
Timing risks
3
Unique runs
3
Open days
9
>
M17
100% peak6 load days21,800 lb across 107.7 machine hours · next scheduled Feb 16
Avg util
30%
Material risks
3
Timing risks
3
Unique runs
3
Open days
9
Feb 12
Thu
No scheduled load.
Feb 13
Fri
No scheduled load.
Feb 14
Sat
No scheduled load.
Feb 15
Sun
No scheduled load.
Feb 16
Mon
501 / 25322
01-3746-001 from Faraday Orders Q1.xlsm
Run day 1/2
24.0 hrs · 4,823 lb
Due
Feb 18
WO
WO-25322-4
Material
KI34
Feb 17
Tue
501 / 25322
01-3746-001 from Faraday Orders Q1.xlsm
Run day 2/2
17.3 hrs · 3,477 lb
Due
Feb 18
WO
WO-25322-4
Material
KI34
Feb 18
Wed
No scheduled load.
Feb 19
Thu
876 / 25295
01-1158-001 from Faraday Orders Q1.xlsm
Run day 1/2
24.0 hrs · 5,224 lb
Due
Feb 21
WO
WO-25295-7
Material
U5182
Feb 20
Fri
876 / 25295
01-1158-001 from Faraday Orders Q1.xlsm
Run day 2/2
5.4 hrs · 1,176 lb
Due
Feb 21
WO
WO-25295-7
Material
U5182
Feb 21
Sat
No scheduled load.
Feb 22
Sun
575 SD / R0447
085751-039 from Meridian Production Plan.xlsx
Run day 1/2
24.0 hrs · 4,605 lb
Due
Feb 24
WO
WO-R0447-15
Material
4641
Feb 23
Mon
575 SD / R0447
085751-039 from Meridian Production Plan.xlsx
Run day 2/2
13.0 hrs · 2,495 lb
Due
Feb 24
WO
WO-R0447-15
Material
4641
Feb 24
Tue
No scheduled load.
Feb 25
Wed
No scheduled load.
Feb 26
Thu
No scheduled load.
M18
119% peak5 load days22,600 lb across 106.1 machine hours · next scheduled Feb 17
Avg util
29%
Material risks
3
Timing risks
3
Unique runs
3
Open days
10
>
M18
119% peak5 load days22,600 lb across 106.1 machine hours · next scheduled Feb 17
Avg util
29%
Material risks
3
Timing risks
3
Unique runs
3
Open days
10
Feb 12
Thu
No scheduled load.
Feb 13
Fri
No scheduled load.
Feb 14
Sat
No scheduled load.
Feb 15
Sun
No scheduled load.
Feb 16
Mon
No scheduled load.
Feb 17
Tue
575 SD / R566
01-1686-001 from Faraday Orders Q1.xlsm
Run day 1/2
24.0 hrs · 4,613 lb
Due
Feb 19
WO
WO-R566-5
Material
4641
Feb 18
Wed
575 SD / R566
01-1686-001 from Faraday Orders Q1.xlsm
Run day 2/2
19.7 hrs · 3,787 lb
Due
Feb 19
WO
WO-R566-5
Material
4641
Feb 19
Thu
No scheduled load.
Feb 20
Fri
197 / 25266
01-5216-001 from Faraday Orders Q1.xlsm
Run day 1/2
24.0 hrs · 6,210 lb
Due
Feb 22
WO
WO-25266-8
Material
4016
Feb 21
Sat
197 / 25266
01-5216-001 from Faraday Orders Q1.xlsm
Run day 2/2
4.6 hrs · 1,190 lb
Due
Feb 22
WO
WO-25266-8
Material
4016
501 / R0548
475957-039 from Meridian Production Plan.xlsx
Run day 1/2
24.0 hrs · 4,828 lb
Due
Feb 23
WO
WO-R0548-14
Material
KI34
Feb 22
Sun
501 / R0548
475957-039 from Meridian Production Plan.xlsx
Run day 2/2
9.8 hrs · 1,972 lb
Due
Feb 23
WO
WO-R0548-14
Material
KI34
Feb 23
Mon
No scheduled load.
Feb 24
Tue
No scheduled load.
Feb 25
Wed
No scheduled load.
Feb 26
Thu
No scheduled load.
M19
200% peak4 load days18,500 lb across 85.9 machine hours · next scheduled Feb 18
Avg util
24%
Material risks
2
Timing risks
3
Unique runs
3
Open days
11
>
M19
200% peak4 load days18,500 lb across 85.9 machine hours · next scheduled Feb 18
Avg util
24%
Material risks
2
Timing risks
3
Unique runs
3
Open days
11
Feb 12
Thu
No scheduled load.
Feb 13
Fri
No scheduled load.
Feb 14
Sat
No scheduled load.
Feb 15
Sun
No scheduled load.
Feb 16
Mon
No scheduled load.
Feb 17
Tue
No scheduled load.
Feb 18
Wed
840 / 25293
01-2901-001 from Faraday Orders Q1.xlsm
Run day 1/2
24.0 hrs · 5,343 lb
Due
Feb 20
WO
WO-25293-6
Material
U2091
587 / FP71045R
085924-039 from Meridian Production Plan.xlsx
Run day 1/2
24.0 hrs · 4,863 lb
Due
Feb 20
WO
WO-FP71045R-12
Material
U9154
Feb 19
Thu
840 / 25293
01-2901-001 from Faraday Orders Q1.xlsm
Run day 2/2
3.4 hrs · 757 lb
Due
Feb 20
WO
WO-25293-6
Material
U2091
587 / FP71045R
085924-039 from Meridian Production Plan.xlsx
Run day 2/2
6.6 hrs · 1,337 lb
Due
Feb 20
WO
WO-FP71045R-12
Material
U9154
Feb 20
Fri
No scheduled load.
Feb 21
Sat
No scheduled load.
Feb 22
Sun
No scheduled load.
Feb 23
Mon
No scheduled load.
Feb 24
Tue
No scheduled load.
Feb 25
Wed
840 / 25340
01-3746-001 from Production Schedule Week 47.xlsm
Run day 1/2
24.0 hrs · 5,333 lb
Due
Feb 27
WO
WO-25340-18
Material
U2091
Feb 26
Thu
840 / 25340
01-3746-001 from Production Schedule Week 47.xlsm
Run day 2/2
3.9 hrs · 867 lb
Due
Feb 27
WO
WO-25340-18
Material
U2091
Planner decision stack
What threatens the weekly load plan right now.
Review these first.
Order 27,118 lb KI20 from APEX
7 scheduled runs on M04, M05, M07, M11 depend on this material. $70,780/day downtime risk if delayed.
Order 17,844 lb KI34 from APEX
3 scheduled runs on M08, M17, M18 depend on this material. $24,437.5/day downtime risk if delayed.
Order 13,055 lb 4641 from CENTEX
2 scheduled runs on M17, M18 depend on this material. $16,105/day downtime risk if delayed.
Order 10,969 lb U2091 from APEX
2 scheduled runs on M19 depend on this material. $12,295/day downtime risk if delayed.
M05 lot 228 SDH has minimal buffer
Completes 2026-02-15 for due date 2026-02-15, leaving 0 day buffer. Consider adding buffer time.
M04 lot 106 has minimal buffer
Completes 2026-02-14 for due date 2026-02-14, leaving 0 day buffer. Consider adding buffer time.
Order 4,247 lb 4271 from CENTEX
1 scheduled runs on M08 depend on this material. $9,610/day downtime risk if delayed.
M05 lot 228 SDH has minimal buffer
Completes 2026-02-24 for due date 2026-02-25, leaving 1 day buffer. Consider adding buffer time.
M07 lot 398 has minimal buffer
Completes 2026-02-16 for due date 2026-02-17, leaving 1 day buffer. Consider adding buffer time.
M08 lot 833 has minimal buffer
Completes 2026-02-15 for due date 2026-02-16, leaving 1 day buffer. Consider adding buffer time.
M08 lot 504 has minimal buffer
Completes 2026-02-18 for due date 2026-02-19, leaving 1 day buffer. Consider adding buffer time.
Order 6,286 lb U9154 from APEX
1 scheduled runs on M19 depend on this material. $6,590/day downtime risk if delayed.
M11 lot 638 has minimal buffer
Completes 2026-02-16 for due date 2026-02-17, leaving 1 day buffer. Consider adding buffer time.
M18 lot 575 SD has minimal buffer
Completes 2026-02-18 for due date 2026-02-19, leaving 1 day buffer. Consider adding buffer time.
Order 5,692 lb U5182 from APEX
1 scheduled runs on M17 depend on this material. $6,410/day downtime risk if delayed.
Order 3,448 lb 4016 from STERLING
1 scheduled runs on M18 depend on this material. $6,290/day downtime risk if delayed.
M17 lot 501 has minimal buffer
Completes 2026-02-17 for due date 2026-02-18, leaving 1 day buffer. Consider adding buffer time.
M17 lot 575 SD has minimal buffer
Completes 2026-02-23 for due date 2026-02-24, leaving 1 day buffer. Consider adding buffer time.
M04 lot 106 has minimal buffer
Completes 2026-02-20 for due date 2026-02-21, leaving 1 day buffer. Consider adding buffer time.
M18 lot 501 has minimal buffer
Completes 2026-02-22 for due date 2026-02-23, leaving 1 day buffer. Consider adding buffer time.
M07 lot 398 has minimal buffer
Completes 2026-02-25 for due date 2026-02-26, leaving 1 day buffer. Consider adding buffer time.
M19 lot 587 has minimal buffer
Completes 2026-02-19 for due date 2026-02-20, leaving 1 day buffer. Consider adding buffer time.
M17 lot 876 has minimal buffer
Completes 2026-02-20 for due date 2026-02-21, leaving 1 day buffer. Consider adding buffer time.
M18 lot 197 has minimal buffer
Completes 2026-02-21 for due date 2026-02-22, leaving 1 day buffer. Consider adding buffer time.
M19 lot 840 has minimal buffer
Completes 2026-02-26 for due date 2026-02-27, leaving 1 day buffer. Consider adding buffer time.
M19 lot 840 has minimal buffer
Completes 2026-02-19 for due date 2026-02-20, leaving 1 day buffer. Consider adding buffer time.
M19 overbooked — 200% peak utilization
85.9 machine hours across the week. 1 overloaded days, 1 tight days.
M18 overbooked — 119% peak utilization
106.1 machine hours across the week. 1 overloaded days, 2 tight days.
M04 at 100% utilization — no buffer for changeover
76.3 machine hours across the week. 0 overloaded days, 3 tight days.
M05 at 100% utilization — no buffer for changeover
91.1 machine hours across the week. 0 overloaded days, 3 tight days.
M08 at 100% utilization — no buffer for changeover
79.9 machine hours across the week. 0 overloaded days, 2 tight days.
M07 at 100% utilization — no buffer for changeover
70.5 machine hours across the week. 0 overloaded days, 2 tight days.
M11 at 100% utilization — no buffer for changeover
37.5 machine hours across the week. 0 overloaded days, 1 tight days.
M17 at 100% utilization — no buffer for changeover
107.7 machine hours across the week. 0 overloaded days, 3 tight days.
Faraday workbook variant needs an explicit source-of-truth decision
Two Faraday variants exist; the newer `Q1` workbook is the safer default, but the choice should be explicit in the product. Recommended: Treat `Faraday Orders Q1.xlsm` as active and preserve the legacy file for reconciliation only.
All demand is scheduled — load plan is complete
18 slots covering 18 requirement lines, all placed on the board.
Publish package generated — ready for handoff
Week of 2026-02-09 published scenario publish package
Run controls
Rerun or publish the scenario
Keep the planning actions close without pushing the board below the fold.
published>
Run controls
Rerun or publish the scenario
Keep the planning actions close without pushing the board below the fold.
Refresh inputs
completeDemand, inventory, and work-order cuts are available for this week.
Create scenario
completeThe active weekly scenario is already open.
Run netting
completeLot-level net requirements are available.
Run scheduling
completeMachine commitments are on the board.
Run replenishment
completeSupplier actions are attached to the plan.
Publish release
completeThe release package is published.
demand
Stable demand inputs
Faraday requests + Meridian style demand
48 rows across 14 entities
inventory
Current WH YG WP inventory cut
Current material inventory and raw material stock
126 rows across 24 entities
work_orders
Open work-order cut
Imported open work relevant to processing demand
22 rows across 12 entities
Material queue
Material shortage queue
Scan blocked materials by protected load and next machine start. Open a row only when you need the lot detail.
Materials needing review
8
Active supplier exceptions on the board
Protected load
105,600 lb
Committed machine load tied to these materials
Next machine start
Feb 12
88,659 lb currently in supplier review
KI20
APEXProtects 7 scheduled slots on M04, M05, M07, M11.
Protected load
30,900 lb
7 slots · lots 106, 228 SDH, 398, 638
Review order
27,118 lb
Review with APEX
Timing
Start Feb 12
Latest due Feb 26
>
KI20
APEXProtects 7 scheduled slots on M04, M05, M07, M11.
Protected load
30,900 lb
7 slots · lots 106, 228 SDH, 398, 638
Review order
27,118 lb
Review with APEX
Timing
Start Feb 12
Latest due Feb 26
Planner action
Review 27,118 lb with APEX before Feb 12 machine start.
Projected coverage drops below the demand window once the processing schedule is applied.
Machines
M04, M05, M07, M11
Lots
106, 228 SDH, 398, 638
First scheduled
Feb 12
Latest due
Feb 26
4271
CENTEXProtects 1 scheduled slots on M08.
Protected load
4,700 lb
1 slots · lots 833
Review order
4,247 lb
Review with CENTEX
Timing
Start Feb 14
Latest due Feb 16
>
4271
CENTEXProtects 1 scheduled slots on M08.
Protected load
4,700 lb
1 slots · lots 833
Review order
4,247 lb
Review with CENTEX
Timing
Start Feb 14
Latest due Feb 16
Planner action
Review 4,247 lb with CENTEX before Feb 14 machine start.
Projected coverage drops below the demand window once the processing schedule is applied.
Machines
M08
Lots
833
First scheduled
Feb 14
Latest due
Feb 16
KI34
APEXProtects 3 scheduled slots on M08, M17, M18.
Protected load
22,200 lb
3 slots · lots 501, 504
Review order
17,844 lb
Review with APEX
Timing
Start Feb 16
Latest due Feb 23
>
KI34
APEXProtects 3 scheduled slots on M08, M17, M18.
Protected load
22,200 lb
3 slots · lots 501, 504
Review order
17,844 lb
Review with APEX
Timing
Start Feb 16
Latest due Feb 23
Planner action
Review 17,844 lb with APEX before Feb 16 machine start.
Projected coverage drops below the demand window once the processing schedule is applied.
Machines
M08, M17, M18
Lots
501, 504
First scheduled
Feb 16
Latest due
Feb 23
4641
CENTEXProtects 2 scheduled slots on M17, M18.
Protected load
15,500 lb
2 slots · lots 575 SD
Review order
13,055 lb
Review with CENTEX
Timing
Start Feb 17
Latest due Feb 24
>
4641
CENTEXProtects 2 scheduled slots on M17, M18.
Protected load
15,500 lb
2 slots · lots 575 SD
Review order
13,055 lb
Review with CENTEX
Timing
Start Feb 17
Latest due Feb 24
Planner action
Review 13,055 lb with CENTEX before Feb 17 machine start.
Projected coverage drops below the demand window once the processing schedule is applied.
Machines
M17, M18
Lots
575 SD
First scheduled
Feb 17
Latest due
Feb 24
U2091
APEXProtects 2 scheduled slots on M19.
Protected load
12,300 lb
2 slots · lots 840
Review order
10,969 lb
Review with APEX
Timing
Start Feb 18
Latest due Feb 27
>
U2091
APEXProtects 2 scheduled slots on M19.
Protected load
12,300 lb
2 slots · lots 840
Review order
10,969 lb
Review with APEX
Timing
Start Feb 18
Latest due Feb 27
Planner action
Review 10,969 lb with APEX before Feb 18 machine start.
Projected coverage drops below the demand window once the processing schedule is applied.
Machines
M19
Lots
840
First scheduled
Feb 18
Latest due
Feb 27
U9154
APEXProtects 1 scheduled slots on M19.
Protected load
6,200 lb
1 slots · lots 587
Review order
6,286 lb
Review with APEX
Timing
Start Feb 18
Latest due Feb 20
>
U9154
APEXProtects 1 scheduled slots on M19.
Protected load
6,200 lb
1 slots · lots 587
Review order
6,286 lb
Review with APEX
Timing
Start Feb 18
Latest due Feb 20
Planner action
Review 6,286 lb with APEX before Feb 18 machine start.
Projected coverage drops below the demand window once the processing schedule is applied.
Machines
M19
Lots
587
First scheduled
Feb 18
Latest due
Feb 20
U5182
APEXProtects 1 scheduled slots on M17.
Protected load
6,400 lb
1 slots · lots 876
Review order
5,692 lb
Review with APEX
Timing
Start Feb 19
Latest due Feb 21
>
U5182
APEXProtects 1 scheduled slots on M17.
Protected load
6,400 lb
1 slots · lots 876
Review order
5,692 lb
Review with APEX
Timing
Start Feb 19
Latest due Feb 21
Planner action
Review 5,692 lb with APEX before Feb 19 machine start.
Projected coverage drops below the demand window once the processing schedule is applied.
Machines
M17
Lots
876
First scheduled
Feb 19
Latest due
Feb 21
4016
STERLINGProtects 1 scheduled slots on M18.
Protected load
7,400 lb
1 slots · lots 197
Review order
3,448 lb
Review with STERLING
Timing
Start Feb 20
Latest due Feb 22
>
4016
STERLINGProtects 1 scheduled slots on M18.
Protected load
7,400 lb
1 slots · lots 197
Review order
3,448 lb
Review with STERLING
Timing
Start Feb 20
Latest due Feb 22
Planner action
Review 3,448 lb with STERLING before Feb 20 machine start.
Projected coverage drops below the demand window once the processing schedule is applied.
Machines
M18
Lots
197
First scheduled
Feb 20
Latest due
Feb 22
Scenario metrics
Week of 2026-02-09 published scenario
Open the board inputs and planning totals when you need the scenario context.
active>
Scenario metrics
Week of 2026-02-09 published scenario
Open the board inputs and planning totals when you need the scenario context.
180,800
Gross lb
105,600
Net lb
655.0
Scheduled hrs
0
Unscheduled lines
Requirement evidence
Requirement detail
Open the source demand and netting lines when you need to verify the board.
18 lines>
Requirement evidence
Requirement detail
Open the source demand and netting lines when you need to verify the board.
01-0306-001
Faraday Orders Q1.xlsm
01-0312-002
Faraday Orders Q1.xlsm
01-1953-001
Faraday Orders Q1.xlsm
01-3746-001
Faraday Orders Q1.xlsm
01-1686-001
Faraday Orders Q1.xlsm
01-2901-001
Faraday Orders Q1.xlsm
01-1158-001
Faraday Orders Q1.xlsm
01-5216-001
Faraday Orders Q1.xlsm
082056-506
Meridian Production Plan.xlsx
082012-611
Meridian Production Plan.xlsx
082023-601
Meridian Production Plan.xlsx
085924-039
Meridian Production Plan.xlsx
085337-039
Meridian Production Plan.xlsx
475957-039
Meridian Production Plan.xlsx
085751-039
Meridian Production Plan.xlsx
01-0306-001
Production Schedule Week 47.xlsm
082056-506
Production Schedule Week 47.xlsm
01-3746-001
Production Schedule Week 47.xlsm
Release package
Published release package
Keep the package close to the load board without letting it consume the entire page.
published>
Release package
Published release package
Keep the package close to the load board without letting it consume the entire page.
Week of 2026-02-09 published scenario publish package
- 0 lb netted into the week plan
- 0 lb sequenced across 18 draft processing slots
- 0 lb of raw material recommended for review
Next release move
Confirm supplier actions and release notes against the same machine commitments shown on this board.
Open release workspace